WIDENINGS, BRIDGES

Railway Bridges in Bruges
Manufacture with extremely high requirements due to dynamic loads

Substitution of an old railway bridge at end of useful life and to allow an increase of the bearing capacity in the new structure created.
Location
Bruges | Belgium
Date
2018
Weight
800 Tons
Project
Widening
Remplacement
48H

Railway Bridges in Bruges

Title:

Description:

WIDENINGS, BRIDGES

Railway Bridges in Bruges
Manufacture with extremely high requirements due to dynamic loads

Substitution of an old railway bridge at end of useful life and to allow an increase of the bearing capacity in the new structure created.
Location
Bruges | Belgium
Date
2018
Weight
800 Tons
Project
Widening
Remplacement
48H

Previous issues

Work for the Société nationale des chemins de fer belges (SCNB). Substitution of an old railway bridge at end of useful life and to allow an increase of the bearing capacity in the new structure created.






Assembled on site in situ

Los requisitos son muy exigentes en cuanto a fabricación por las cargas dinámicas a las que se ve sometido un puente ferroviario y la posibilidad de fallo por esfuerzos de fatiga. Además el entorno es particularmete agresivo en términos de corrosión.

En el montaje no está permitido un solo error puesto que se provocaría el colapso del tráfico de la línea ferroviaria. Se sustituyo, en menos de 48H, el puente antiguo de 300 toneladas por un nuevo puente de acero de más de 800 toneladas.